MHI Receives 10-Year Operations and Maintenance (O&M) Renewal and Extension Contract for AeroTrain
![]() |
[APM for Washington Dulles International Airport] |
The AeroTrain APM system in operation at Washington Dulles International Airport has a route length of 4.4 miles (approx. 7.1 kilometers) connecting 4 stations. The construction order for the system was received jointly with Sumitomo Corporation, and passenger service commenced in January 2010. Recently the system's service availability level has annually averaged to 99.94%, a figure attesting to the AeroTrain’s excellent safety and reliability.
CMS is currently performing O&M services for all APM systems delivered by MHI to the United States. CMS's capitalization derives from two sources: Mitsubishi Heavy Industries America, Inc. (MHIA), an MHI group company based in New York City, and Sumitomo Corporation. Within the United States, MHI provides comprehensive services – from system supply to O&M - for its APMs in operation at airports in Miami, Washington/Dulles and Atlanta. This fully integrated capability enables consistently high service availability levels and outstanding customer trust at all sites. In recognition of this superlative track record, during 2014 MHI won contracts for construction and O&M of new APM systems at both Orlando international Airport and Tampa International Airport.
Going forward, MHI will continue to strive to attract further orders based on the reliability of its APM systems already in operation, coupled with its capacity to provide the complete spectrum of services from construction to O&M.




![[APM for Washington Dulles International Airport]](http://www.mhi-global.com/news/story/__icsFiles/afieldfile/2014/12/02/141202-No1859.gif)
Комментарии