Towing Operation of “Prirazlomnaya” Platform in Pechora Sea Started
OREANDA-NEWS. September 19, 2011. The towing operation of “Prirazlomnaya” offshore ice-resistant stationary platform in the oil field in Pechora sea started from the shipyard of the shipbuilding plant in
The icebreaker “Vladislav Strizhov” and transport and towing vessels “Kigoriak”, “Neptun” and “Eems” were engaged in transportation of the offshore ice-resistant stationary platform.
The towing of the platform to the oil field will take about two weeks. The length of the itinerary will be
GSE OJSC acted as a General Contractor of mechanical and assembly works at the top of the platform, having done these works by its subsidiary - GSE Volgograd Firm “Neftezavodmontazh” LLC. Electrical works have been produced by “GSE SPETSNEFTEENERGOMONTAZHAVTOMATIKA” LLC.
Комментарии