In the service area of IDGC of Centre all emergency outages were eliminated
Abundant precipitation in the form of rain and wet snow on the background of negative temperatures and gusting wind caused the formation of ice on power lines and trees. This led to numerous breakages of wires and, as a consequence, significant interruption in the power supply. In the branches of IDGC of Centre, hit by the bad weather, on Friday evening a special operation mode was introduced, which is remaining to this day. 116 crews, consisting of 580 specialists were involved in the first responding and restoration operation. 162 specialized vehicles were used, including off-road.
Комментарии