OREANDA-NEWS. October 26, 2010. The well No 312 drilled from the platform No 13 was commissioned at “Gunashli” field. The daily production of the well, drilled to Girmaki Suite by “SOCAR-AQS” Joint Venture, makes 120 thousand cubic meters of gas and 20 tons of condensate from 3613-3593 meters interval. The well will be put into operation by “28 May” OGPD.