OREANDA-NEWS. January 26, 2011.  Gunashli field plays an important role in oil and gas industry of the country. New wells are drilled as well as idling ones are commissioned there after taking necessary technical measures. For instance, 28 May OGPD takes significant steps in this direction. Recently the well #266 drilled from the platform #14 and well #235 from the platform #15 have been put into commission after total overhaul.

At present, production of the well #266 makes 60 tons of oil and well #235 – 50 tons of oil per day. The repair works have been conducted by wells’ major workover shop of 28 May OGPD.