OREANDA-NEWS. April 22, 2011. Recently two wells from the platform #660 have been commissioned at Darvin Bankasy field. The production of the well #658 drilled to Girmaki Suite makes 5 tons of oil per day from 1429-1394 meters depth. The daily production of the well #660 drilled from the same platform to Girmaki Suite equals 6 tons of oil from 1417-1368 meters depth.

The wells drilled by Oil Rocks Offshore Drilling Works Office of the Complex Drilling Works Trust will be commissioned by Absheronneft OGPD. It should be noted that at present, 8 wells are commissioned at the platform #660.