OREANDA-NEWS. SIBUR has completed another project to increase associated petroleum gas (APG) processing rates at its gas processing facilities. The upgrade of a low-temperature condensation unit (LTCU) at Muravlenko GPP brought the recovery rate of desired fractions in APG processing from 95.6% to 98%.

The achieved rates are in line with the best global practices.

As part of the project, the LTCU process was improved. The technical upgrades of the unit included an extra heat-exchanger, installed with the involvement of NIPIgazpererabotka. The project is based on a technical innovation developed by the SiburTumenGaz management.