OREANDA-NEWS. Gazprom has put into operation today the gas pre-treatment plant UGGP-10 at the Kharvutinskaya area of the Yamburg oil and gas condensate field.

Gas from UPPG-10 with 8.2 bcm annual productivity will be supplied to UKPG-9 with 18.2 bcm annual design capacity, which was commissioned in December 2006.