OREANDA-NEWS. November 8, 2007. The high-flow-rate well № 420 was placed into commission from the platform № 13 in “Gunashli” field. Daily flow rate of the well is 100 tons of oil and 42 thousand cubic meters of associated gas in 2930 meters. The platform № 13 was put into commission of “28 May” OGED 3 years ago. Thereafter 6 wells were drilled from that platform. Two of them are gas-condensate wells, which give 1.1 million cubic meters gas and 160 tons of condensed fluid per day. The daily flow rate of four oil wells is 372 tons of oil. Fourteen more wells are expected to be drilled from the platform № 13.