OREANDA-NEWS. December 13, 2007. On the Serovskiy mine building of a new weighing station is put in operation. On the Serovskiy mine, main source of raw materials of “Ufaleynikel” public corporation and “PO “Rejnikel” close sorporation, assembling of the shunting device on the second railroad dead end of the ore storehouse is over. On the same day building of a new weighing station is put in operation. Two-storeyed building is equipped with innovations – electronic scales, fibre-optic cable and software. From the 10th of December will be finished assembling of the autoweight in the ore storehouse. With a view automatically to take stock of extent of raw materials, brought to the ore storehouse in December-January, identifiers will be installed on dump trucks BELAZ with the help of the instrumentation and automation staff. Measures are developed and south collapse executed at the turn of north and south quarries. Ores of siliceous-ferriferous type are uncovered on the 3rd bed of the 7th ore body of the Serovskiy deposit. From the 10th till the 20th December transportation of the grab crane to a new dosing unit is planned.