Act of Preparation to Autumn-Winter Operations of Irkutskenergo Signed
OREANDA-NEWS. November 29, 2010. The Act of preparation to 2010-2011 autumn-winter maximum load was signed following the results of inspection of JSC Irkutskenergo and its branches. The inspection of JSC Irkutskenergo facilities was performed by the specialists of EMERCOM, Pribaikalsk branch of the Federal Service for Ecological, Technological and Nuclear Supervision, Branch of JSC SO UES of Siberia Supervisory Control (Irkutsk Regional Supervisory Control) and by the services of executive management. Subject to the pre-arranged schedule,. 650 procedures were performed by the Company’s specialists during the preparation of the energy systems to the stable work in the cold period. The investments in the construction program for 2010 totaled RUR 5,097 mln. This year the company’s investments in the reconstruction and technical reequipment of the facilities totaled RUR 2,996 mln; modernization – RUR 602 mln. Currently the HPPs of JSC Irkutskenergo are equipped with 3,335 thousand tons of coal. The heating season is in normal mode.
Комментарии