Rakurs Shipped Control System to Zagorskaya PSHPP
OREANDA-NEWS. April 5, 2011. The equipment of the control system for hydroelectric unit No.1 was shipped to Zagorskaya pumped-storage hydro power plant.
The next stage of SPC Rakurs works on complex project of automated control system modernization has been completed. The equipment of local control system passed stages of testing and setting up before being shipped to Zagorskaya PSHPP.
During the period from April till September 2011 as part of reconstruction of hydroelectric unit No.1 it is planned to upgrade the control system and the system of relay protection and automatics.
The volume of SPC Rakurs works agreed in the contract with Zagorskaya PSHPP includes supply of control systems for all six units of the station. During 2009-2010 local control systems for hydroelectric units No.2,4,5,6 have been put in commission.
Комментарии