OREANDA-NEWS. May 06, 2011. In April 2011, 2.8 million tons of Azerbaijani oil were transported via the Baku-Tbilisi-Ceyhan main export pipeline. 11.4 million tons of oil were transported through this pipeline during January-April 2011.

The transportation via BTC has made up 155.5 million tons of Azerbaijani oil since the moment of its operation until May 1, 2011. Besides, 797 thousand tons of Turkmen oil was transported via BTC during April.