OREANDA-NEWS.  Metro line 3 starts from the intersection of Fangxing Road and Feicui Road, running through Feicui Road, Cuiwei Road, Baota Road, Huaining Road, Qianshan Road, Linquan Road, Bianhe Road, and ends at Xiangcheng Stop. However, the insiders said it is only a preliminary scheme, the final scheme may be adjusted.

It is learned that the budget for line 3 is about 23.98 billion CNY and line 3 is 37.4 kilometers long, including 31.3 kilometers of underground section and 6.1 kilometers of elevated section.

It is introduced that metro line 3 will be put into trial operation in October of 2019.