Culture and leisure


State


Industry


Transport


Science and engineering


Finances


Communication


IT, Media


Fuel and energy


Trade and Services


Physical activity


World


Русская версия


Login
✖
Loginor E-mail
Password
Remind password | Register
top news
.
Ozon made a statement amid increased risks due to UAV attacks
.
Pashinyan asked Putin to solve the problem
.
Trump promised to recoup the costs of the war with Iran
.
39 thousand Armenian roses were destroyed in Russia
  • Oreanda-News.com
  • ›
  • Science and engineering
  • ›
  • Dubai Unveils World's First 3D-printed Office Building
26.05.2016, 08:36

Dubai Unveils World's First 3D-printed Office Building

Science and engineeringNew technologiesBuilding
OREANDA-NEWS. The use of 3D printing in architecture is still small as logistics are being ironed out, but a new proof of concept has just been unveiled. The 250-square-metre space (2,700 square foot) is what Dubai's Museum of the Future project is calling the world's first 3D-printed office building. China unveiled the world's first 3D printed office building and mansion in early 2015.

First announced in June 2015, the new building's purpose is to showcase the United Arab Emirates' commitment to innovation and looking to the future, and promote the UAE as a world leader in 3D printing.

"We implement what we plan and we pursue actions not theories. The rapidly changing world requires us to accelerate our pace of development as history does not recognize plans but achievements," Vice President and Prime Minister of the UAE and Ruler of Dubai His Highness Sheikh Mohammed bin Rashid Al Maktoum said at the grand opening.

A 3D printer was used to print the building in a special cement mixture, layer by layer. In all, it took a total of 17 days to print the building at a cost of about $140,000, after which the interior and exterior design details were added.

One person was employed to monitor the 3D printer. Another seven people took care of the installation of building components on-site, and another 10 electricians and other specialists looked after the engineering. They represented a savings of 50 percent on normal labour costs.

The open plan office will initially house the Dubai Future Foundation temporarily. In addition to providing a workspace, it could also, in the future, be used to host exhibitions, workshops and other events.

Подпишитесь на каналы ИА "Ореанда-Новости":
VK News News


Материалы по теме:

Russia and the United States have agreed to extend the work of the ISS15.07.2026 05:31:18

Printed circuit boards for printers will be launched in Russia, media reports say03.07.2026 17:31:45

Russian micro-helicopter to overcome minefields30.06.2026 22:18:47

Другие новости:

Стала известна главная причина ухода Петросян из группы Тутберидзе21.07.2026 13:37:42

Команда Роналду сменила главного тренера во время чемпионата мира03.07.2026 20:43:42

Share on social networks:
 Подписаться на наши группы: Instagram | VK | Facebook | Twitter


Rate this article:

Комментарии

Войти или зарегистрироваться.
Loginor E-mail
Password
Remind password | Register
Комментариев нет

НОВОСТИ ПАРТНЁРОВ



Latest section news

Russia and the United States have agreed to extend the work of the ISS
15.07.2026 05:31
Printed circuit boards for printers will be launched in Russia, media reports say
03.07.2026 17:31
Russian micro-helicopter to overcome minefields
30.06.2026 22:18
Roscosmos talks about the record-breaking Russian engine
25.06.2026 11:50
Cargo Dragon ship detaches from ISS
16.06.2026 11:40
Other section news


RSS Terminal About company Contacts Ad on the site
Copyright (c) Oreanda-News | Тел.: +7 (495) 995-8221

In case of reprinting or quoting the hyperlink to the website of Oreanda-News agency is required.